Wet Detention

The Wet Detention worksheet calculates the average annual nitrogen (TN) and phosphorus (TP) removal of a permanently wet pond serving one catchment. You open it from the catchment’s treatment choices after the catchment (area, land use, rainfall zone) has been entered. You enter the permanent pool volume, say whether the pond has a littoral zone, and add any floating wetland (MAP) credit; BMPFast computes the average annual residence time (ART) and the removal from it.

Note: A common error in the use of software is not understanding the design conditions for various BMPs.  As an example, the average annual removal curves were used for all wet ponds, even those that had no littoral zones.  This has been corrected by the entry on the BMPFast worksheet, which asks the user to check if there is a littoral zone.  Now in BMPFast, there is inclusion of a wet pond with no littoral zone, typical of a vertical side pond, or in areas for which there are no requirements to maintain the littoral zone. This wet pond with no littoral zone was not an input in past software, and thus, annual removal was overestimated. That is BMPFast version 1’s reading. BMPFast 2 takes the equations as a pond without a littoral zone and gives a pond with one a credit instead; see In BMPFast 2.

Description:

Wet detention ponds are surface ponds that are permanently wet. They are designed to slowly release a portion of the collected stormwater runoff through an outlet structure and to remove runoff pollutants. They receive an annual removal credit when installed using acceptable design and maintenance criteria. There is a catchment area associated with each. The normal permanent pool elevation is below the elevation of the surrounding land.

Underground holding ponds are not considered wet ponds. Wet ponds are often effective BMPs for sites with moderate to high water table conditions. They are detention treatment systems that provide removal of both dissolved and suspended pollutants by taking advantage of physical, chemical, and biological processes within the pond for time periods usually greater than 14 days of residence time.

Wet ponds are used frequently and provide a predictable recovery of storage volumes. They are easily maintained by the designated maintenance entity.

How to use this worksheet

These steps are for the BMPFast version 1 worksheet. In BMPFast 2 the littoral zone is set on the pond’s Entry tab and counts as a credit: see In BMPFast 2.

  1. Tick Check if there is a littoral zone if the pond has a planted littoral shelf. Leave it clear for a vertical-sided pond or one where the littoral zone is not required to be maintained. If this pond is routed in series with another wet pond, tick it on only one pond in the series: the littoral zone credit can be applied only once, and BMPFast warns you (when you tick the box, on Calculate or Back, and in the reports) when more than one pond in a series has it. Keep it on the most upstream pond (Ron Eaglin, October 19, 2026); ponds in parallel, on separate branches, may each keep it.
  2. Enter the Permanent Pool Volume (acre-feet).
  3. Enter any Floating Wetland or other MAPs Credit (%) granted by the reviewing agency (0 if none). Appendix O, Table 1 gives 12 % removal for floating islands or managed aquatic plant systems covering 5 % of the pond, harvested at least every 12 months. BMPFast accepts up to 100 %, but above 12 % it warns on the worksheet and in the report: a higher credit needs its own basis (Applicant’s Handbook Vol. I, Section 9.5.2).
  4. Tick Check if an ART can be over 200 days only if your reviewing agency allows credit for residence times above 200 days. The Applicant’s Handbook Volume I, Appendix O, sets the maximum average annual residence time at 200 days and lets designers use a longer one “if they provide evidence to support it”.
  5. Click Calculate. The report appears in the lower pane. Click the same button (now Equations) to see the equations and the values used; click it again (Report) to return to the report.
  6. Optionally use Anoxic Depth to check the depth of the permanent pool, Sizing to find the pool volume that meets the removal targets, and Plot to see the removal curve.
  7. Click Back to keep the values and return to the catchment.

Inputs

Input (as on screen)UnitsWhat it means / how it is used
Check if there is a littoral zonecheck boxTicked: the full removal from the residence-time equations is used. Clear: the N and P removal from the equations are each reduced by 10% (multiplied by 0.90) before any floating wetland credit is added. Changing this box recalculates immediately. BMPFast 2 counts it the other way by default: a pond with a littoral zone adds a credit of up to 10 percentage points, and a pond without one keeps the equations’ removal (see In BMPFast 2).
Permanent Pool Volume (acre-feet)ac-ftVolume of the permanent pool (below the control elevation). Used to compute the average annual residence time: ART = Permanent Pool Volume / Annual Runoff Volume × 365. The pond is treated as not defined (no treatment) while this is 0.
Floating Wetland or other MAPs Credit (%)%Additional removal credit for floating wetland mats or other managed aquatic plants. It is applied to the part of the load the pond does not remove: added removal = Credit × (100 − pond removal) / 100. From 0 to 100; a larger value is taken as 100. 0 = no credit. When it is above 0 the BMP is titled “Wet Detention with Floating Wetland Mats” in reports.
Input Pond TP (ug/l) if data availableµg/LUsed only by the Anoxic Depth button. If you have a measured or expected mean pond TP concentration, enter it; leave it at 0 and BMPFast estimates it from the catchment’s TP event mean concentration and the pond’s P removal. It is reset to 0 each time the worksheet opens and is not saved.
Check if an ART can be over 200 dayscheck boxClear (default): the calculated ART is capped at 200 days, so a larger pool volume earns no more credit beyond that. Ticked: the full calculated ART is used.

Values taken from the catchment (not entered here): the annual runoff volume to the pond, the watershed area (the catchment’s post-development area minus the BMP area entered for the catchment, which is the pond’s permanent pool area), curve number, DCIA, rainfall zone and the TN/TP event mean concentrations.

Average Annual Residence Time (ART)

As shown in the figures below, the treatment effectiveness of a wet pond is directly related to the annual residence time that stormwater runoff occupies within the wet pond before discharge. The longer the residence time, the more opportunity the various pollutant load reduction mechanisms within the wet pond system have to function.

Average Annual Residence Time Formula

ART = 365 × V / Q

Where:

  • ART = Average Annual Residence Time (days)
  • V = Permanent pool volume (acre-feet)
  • Q = Average annual flow rate (acre-feet/year)

In BMPFast, Q is the catchment’s average annual runoff volume (ac-ft/yr). Unless Check if an ART can be over 200 days is ticked, ART is capped at 200 days.

Applicant’s Handbook reference

Appendix O, Wet Detention: residence time is the permanent pool volume (all the water below the control elevation) divided by the annual runoff, times 365; BMPFast computes the ART the same way, with the catchment’s annual runoff volume.

Appendix O, Wet Detention, Limits to Average Annual Residence Time throughout the State: the maximum is 200 days (79.9 % TP, 42.8 % TN), and “Designers may use a longer maximum residence time if they provide evidence to support it”; BMPFast caps the ART at 200 days unless “ART can be over 200 days” is ticked.

ART (days)
Removal Efficiency of Total Phosphorus in Wet Detention Ponds
 as a Function of Average Annual Residence Time (ART)
ART (days)
Removal Efficiency of Total Nitrogen in Wet Detention Ponds
as a Function of Average Annual Residence Time (ART)

Method and equations

Methodology. Wet Detention Methodology explains the method in full: the residence time, the nitrogen and phosphorus equations and their source, the littoral zone and MAPs rules, with curves of removal against residence time.

BMPFast applies these equations, in this order (they are also shown on the worksheet’s Equations page):

Residence Time rt (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft) x 365
(capped at 200 days unless "ART can be over 200 days" is ticked)
N removal (%) = 43.75 x rt / (4.38 + rt)
P removal (%) = 40.13 + 6.372 x ln(rt) + 0.213 x [ln(rt)]^2
BMPFast v1, no littoral zone: N removal = N removal x 0.90, P removal = P removal x 0.90
(BMPFast 2 instead: with a littoral zone, N removal = N removal + Littoral zone credit (0 to 10), P the same;
without one, no change)
Wetland credit: N removal = N removal + Wetland Efficiency Credit x (100 - N removal) / 100
P removal = P removal + Wetland Efficiency Credit x (100 - P removal) / 100
N and P removal cannot exceed 100%

Sources: the 200-day maximum is in the ERP Applicant’s Handbook Volume I (June 28, 2024), Appendix O, Wet Detention (“Limits to Average Annual Residence Time throughout the State”); the littoral zone’s 10 % is in Appendix O, Table 1 (“Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”; DB Environmental, 2005). See Wet Detention Methodology. When wet ponds are in series, the littoral zone credit can be applied only once.

The littoral-zone reduction (in BMPFast 2, the littoral zone credit) is applied before the floating wetland credit. A wet detention pond retains no water: all the runoff that enters leaves as surface discharge, so the removal is a concentration reduction, and the outflow volume equals the inflow volume.

Applicant’s Handbook reference

Appendix O, Wet Detention, TP and TN percent removal equations: TP = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]² and TN = 43.75 t / (4.38 + t); BMPFast uses these equations unchanged.

Appendix O, Table 1 (BMP Efficiencies), Littoral Zone: gives “Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”; BMPFast version 1 differs in form: it takes the equations as the removal of a pond with a littoral zone and multiplies the removal by 0.90 when there is none. BMPFast 2 follows the handbook’s form: the equations are a pond without a littoral zone, and one with a littoral zone adds up to 10 percentage points.

Appendix O, Table 1 (BMP Efficiencies), Floating islands/managed aquatic plant systems (MAPS): gives “12% removal with 5 % pond coverage based on harvesting at least every 12 months”; BMPFast uses the credit the reviewing agency grants and does not limit it to this value.

Source reference

Harper, H.H. and Baker, D.M. (2007). Evaluation of Current Stormwater Design Criteria within the State of Florida. Final report, FDEP Contract S0108, Section 5.2.2, Figures 5-9 and 5-10 (pages 5-38 and 5-39) (link): the TP and TN removal equations are the best-fit relationships between removal and residence time for Florida wet detention ponds (R² 0.897 for TP, 0.800 for TN); the handbook adopts them and BMPFast uses them unchanged.

DB Environmental, Inc. (2005). Quantifying the Effect of a Vegetated Littoral Zone on Wet Detention Pond Pollutant Load Reduction (as cited in Appendix O, Table 1): the source of the handbook’s 10 % littoral zone credit; BMPFast version 1 applies it as a reduction, 90 % of the equations’ removal for a pond without a littoral zone (Ron, 2026-10-05); BMPFast 2 adds it as a credit of up to 10 percentage points for a pond with one (Ron, 2026-10-20); both allow the credit only once for ponds in series (Ron, 2026-10-16).

FDEP and the water management districts (2010). Stormwater Quality Applicant’s Handbook: Design Requirements for Stormwater Treatment Systems in Florida, March 2010 draft (not adopted), Section 14.2, Table 14.1 (Nutrient Removal Credits for MAPS) (the draft, not adopted: PDF, 16 MB): proposed 10 % TN and TP for a littoral zone and 20 % to 40 % for floating wetland mats or islands, applied with the treatment train equation; BMPFast applies the MAPs credit to the load the pond leaves and does not limit the value typed.

The Equations page

Once the report is current, the Calculate button reads Equations. Clicking it replaces the report with a page that lists the equations above, the notes (200-day cap, littoral reduction applied before the wetland credit, removal limited to 100%), and a Values table with the numbers used: Permanent Pool Volume, Wetland Efficiency Credit, Annual Runoff Volume (ac-ft), Treatment Rate (shown as “no media mix”), and the resulting N removal and P removal. Hydraulic capture is not listed, because a wet pond does not retain runoff. Click the button again (Report) to return to the report. If you change any input, the button returns to Calculate.

Results (the report)

The report in the lower pane contains:

  • Wet Detention Input Variables: Permanent Pool Volume (ac-ft); Permanent Pool Volume for 31 days residence (ac-ft) = 31 × annual runoff volume / 365, the pool volume that would give a 31-day ART; Average Residence Time (days), after the 200-day cap if it applies; Has Littoral Zone; Wetland Efficiency Credit (%).
  • Watershed Characteristics: Watershed Area (acres), Contributing Area to BMP (ac), Watershed Non-DCIA Curve Number, Watershed DCIA Percent, Rainfall Zone, Rainfall (in).
  • Surface Water Discharge: Provided Nitrogen Treatment Efficiency (%) and Provided Phosphorus Treatment Efficiency (%), the final removals after the littoral reduction and wetland credit. A value of 100% or more is shown as 99%.
  • Surface Discharge Load Diagram: N and P load into the pond (kg/yr), the removal efficiencies, the N and P load leaving (kg/yr) and the mass removed. This is for this catchment alone; routing with other catchments is done on the Catchment Configuration screen.

Buttons and features

ButtonWhat it does
Calculate / Equations / ReportCalculate appears whenever the inputs differ from those the report was calculated with; it reads the inputs, calculates and shows the report. When the report is current the button toggles between the Equations page and the Report.
Anoxic DepthCalculates the depth below which the pond is expected to become anoxic, and shows the Anoxic Depth report in the lower pane (see below). Uses Input Pond TP if it is not 0.
SizingOpens the Sizing window for this pond. Its sizing variables are Permanent Pool Volume (steps of 0.5 ac-ft, minimum 0.01) and Wetland Efficiency Credit (steps of 5%, 0–100%). It plots N and P removal against the chosen variable with the N and P removal targets (defaulting to the project’s Maximum % Removal) and the ART. Apply keeps the new values on the worksheet; Cancel restores the original ones. Its Equations button shows the same Equations page as this worksheet. See Sizing.
CostOpens the Life-Cycle Cost Analysis for this pond (cost components, routine maintenance, present worth, annualized cost and cost per pound of TN/TP removed).
PrintOpens what is shown in the lower pane (report, Equations page or Anoxic Depth report) in the Report Viewer, where it can be printed or copied.
PlotOpens a chart of removal efficiency against average residence time (0 to 500 days) for this pond’s littoral and wetland settings (the same reduction and credit as the calculation, so the marker sits on the curve), with a marker at the current ART. The chart’s menu switches between Nitrogen and Phosphorus, and has Print, Copy and Back.
HelpOpens this page.
BackSaves the values entered (whether or not you clicked Calculate), recalculates, and closes the worksheet.

The status bar at the bottom of the window shows the project’s Maximum % Removal for TN and TP, the targets the treatment train must meet for the project’s analysis type.

Anoxic Depth

The Anoxic Depth report checks whether the permanent pool is deeper than the depth at which the water becomes anoxic. It uses the equations of Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49), valid for anoxic depths from 0.8 to 29.5 feet, based on the mean annual stormwater mass remaining in the pond:

Mean annual pond TP (ug/l) = Input Pond TP, or if that is 0:  1000 x TP EMC (mg/l) x (1 - P removal / 100)
Mean chlorophyll-a (mg/m^3) = exp(1.058 x ln(pond TP) - 0.934)
Mean Secchi disk depth (m) = (24.2386 + 0.3041 x chl-a) / (6.0632 + chl-a)
Anoxic pool depth (ft) = (3.035 x Secchi + 0.02164 x chl-a - 0.004979 x pond TP) x 3.281

The report lists the Overall Provided Phosphorus Treatment Efficiency (%), Mean Annual Pond TP Concentration (µg/L), Mean chlorophyll-a concentration (mg/m³), Mean Secchi Disk Depth (m) and Anoxic Pool Depth (ft). If the anoxic depth is less than the pond depth, recalculate the permanent pool volume using the anoxic depth and re-enter it. Nothing is calculated if the catchment’s TP concentration is 0 or the P removal is 0% or 100%. To return to the normal report, click Equations and then Report, or change an input and click Calculate.

Source reference

Harper, H.H. and Baker, D.M. (2007). Evaluation of Current Stormwater Design Criteria within the State of Florida. Final report, FDEP Contract S0108, Section 6.4.2 Zonation and Stratification (Figure 6-14 and Table 6-16, pages 6-47 to 6-49), applied in the design examples of Section 7 (link): gives the Florida relationships from pond TP to chlorophyll-a and from chlorophyll-a to Secchi depth, and the anoxic depth model, valid for anoxic depths of 0.25 to 9.0 m; BMPFast’s Anoxic Depth report uses these equations.

Input Data

Wet Detention Pond with Littoral Zone and Floating Wetland

  • Permanent pool volume: 0.3 acre-feet
  • Littoral zone included
  • Floating wetland coverage: 5% of pond area
  • Input pond TP value required only if calculating anoxic depth

The floating wetland enhances nutrient uptake and improves overall removal efficiency depending on regulatory credit and maintenance requirements.

Wet Pond with No Littoral Zone and 10% Floating Wetland Coverage

  • No littoral zone
  • Floating wetland coverage: 10% of pond area
  • Enter permanent pool volume
  • Floating wetland or Managed Aquatic Plant (MAP) credit is determined by the reviewing agency
  • Typically applied to restricted catchment areas (e.g., redevelopment urban sites)

Overall Removal Calculation

The calculation for overall pollutant removal (detention pond + floating wetland) follows the series equation provided in the Applicant’s Handbook, Volume 1 (June 28, 2024), page 9.7.

Example – Total Nitrogen (TN)

For a wet pond with no littoral zone:

  • Pond TN removal = 36%
  • Floating wetland credit = 20% applied to the remaining untreated portion
And as an example, for TN and wet pond TN removal with no littoral zone of 36% and an additional 20% granted for the floating island applied to the remaining amount: 

Series equation:

1 − [(1 − 0.36) × (1 − 0.20)]
= 1 − (0.64 × 0.80)
= 1 − 0.512
= 0.488

Overall removal = 48.8%

This is NOT calculated as 36% + 20% = 58%. Removal efficiencies must be applied in series, not summed.

Applicant’s Handbook reference

Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): BMPs in series are combined as 1 − [(1 − Eff1) × (1 − Eff2) × …], so each one acts on the load the one before it leaves; BMPFast adds the floating wetland credit to the pond’s removal this way.

Notes and limits

  • The notes at the top of the worksheet: “For credit, in some applications, annual residence times cannot exceed an upper limit” (hence the 200-day cap) and “Pond must include a littoral zone. If no littoral zone, the credit is reduced by 10%.” BMPFast version 1 applies this reduction by multiplying the N and P removal by 0.90. BMPFast 2 gives a credit for a littoral zone instead (In BMPFast 2).
  • Underground holding ponds are not wet ponds and should not be entered here.
  • With a permanent pool volume of 0 the pond is not defined and provides no treatment.
  • The floating wetland / MAP credit is set by the reviewing agency; BMPFast does not limit the value typed on the worksheet, so enter only an approved credit.
  • Wet detention can be the last BMP in a BMP in Series (Multiple BMP) after one or more retention BMPs; see the BMP in Series page for how the pond is routed in that case.

In BMPFast 2

The littoral zone is a credit. Ron Eaglin, October 20, 2026: “This will be a 10% credit for having a littoral zone, it is no longer a penalty.” On the pond’s Entry tab, How the littoral zone counts is Littoral zone credit (BMPFast 2) unless you choose otherwise. Set There is a littoral zone to Yes for a pond with a planted littoral shelf, and enter the Littoral zone credit: 0 to 10 percentage points (the % on the Entry tab is points added, not 10 % of the removal) (10 is the handbook’s maximum; enter less when the littoral zone is smaller than AH Volume II asks), added to both the N and the P removal from the equations, before the MAPs credit, and never above 100 %. A pond with 40 % removal and a credit of 10 removes 50 %. A pond without a littoral zone keeps the equations’ removal: it is no longer reduced. Give the basis for the credit to your permit reviewer.

BMPFast (version 1)’s way is still a choice. Reduce without a littoral zone (v1) calculates as BMPFast version 1 does: a pond with a littoral zone keeps the equations’ removal, and one without gets 90 % of it. When BMPFast 2 opens a v1 project (.bmpt) it uses the credit (10 for a pond with a littoral zone) and says so in a note, so a v1 pond’s results are higher in BMPFast 2; choose the v1 method to repeat v1’s numbers. The report says which method the pond used. Both methods are worked on one pond in Comparison of Methods for Calculating the Littoral Zone Credit, and the BMPFast 2 sample problem wet detention pond with a littoral zone uses the credit.

Littoral zones in series. When wet ponds are routed in series, the littoral zone credit is taken only once, on the most upstream pond; ponds in parallel, on separate branches, may each keep it with their own catchment (Ron Eaglin, October 19, 2026). The Wet Detention, Summary, Complete and AH Vol 1 reports warn when more than one pond on a flow path has it, and say which to untick. The sample problem wet ponds in series has the littoral zone on its upstream pond only.

Comparison of methods

Sample problems

Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.