Two wet detention ponds can be placed one after the other. BMPFast can model them two ways, and they give different results. This page explains both, calculates them on one example, and shows how far apart they are. The pond equations are those of Wet Detention Methodology: the Applicant’s Handbook Volume I (June 28, 2024), Appendix O, Traditional BMP Treatment Efficiencies, Wet Detention (Harper and Baker, 2007), with the 200-day limit of the same section.
Method A: the same pond twice in BMPs in Series
In BMPs in Series a catchment can hold only one Wet Detention. Choosing Wet Detention in two slots next to each other therefore uses the same pond twice. BMPFast warns you when you do this, and calculates it as one pond with twice the permanent pool: the residence time of the summed pool, then the pond’s 200-day limit, littoral zone and MAPs credit, each applied once.
Residence time (days) = (pool 1 + pool 2) / annual runoff x 365 (200 days at most, unless ART over 200 days is allowed)
N removal (%) = 43.75 x ART / (4.38 + ART); P removal (%) = 40.13 + 6.372 ln(ART) + 0.213 [ln(ART)]^2
x 0.90 without a littoral zone; then the MAPs credit on what remains
This is the BMP Trains manual’s reading of two ponds in series: its example gives “the removal at 50 days” of the total permanent pool.
Source reference
BMPFast’s rule (Ron, October 16, 2026, P4590 Q2): a catchment has one Wet Detention, so Wet Detention twice in BMPs in Series is the same pond with the summed pool; the BMP Trains manual’s example reads the removal at the total pool (BMP Trains 2020 User Manual, Stormwater Management Academy, University of Central Florida, December 2021 (stars.library.ucf.edu/bmptrains/25)). The pond equations are from Harper, H.H. and Baker, D.M. (2007), Evaluation of Current Stormwater Design Criteria within the State of Florida, final report, FDEP Contract S0108, Environmental Research & Design.
Method B: two ponds, through the routing
To model two different ponds, use the Routing: the catchment drains to its own pond, and is routed to a second catchment that has no area of its own and only a Wet Detention BMP, the second pond. BMPFast calculates the chain as a “Detention in Series” strand: each pond with all the runoff reaching it, and the removals chained, the second pond removing its share of what the first lets through. That chaining is Equation 9-5 of the Applicant’s Handbook Volume I, section 9.5.1 Treatment Train Nutrient Reduction.
Residence time of pond i (days) = pool i / annual runoff x 365 (each 200 days at most)
Removal of each pond from the equations above (x 0.90 for a pond without a littoral zone)
Removal of the two (%) = 100 x [1 - (1 - removal 1 / 100) x (1 - removal 2 / 100)] (AH Vol I, Equation 9-5)
When ponds are in series the littoral zone credit can be taken only once, so in this method one pond has it and the other gets 90 % of its removal. BMPFast warns when more than one pond in a series has a littoral zone.
Applicant’s Handbook reference
Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): two ponds are combined as 1 − [(1 − Eff1) × (1 − Eff2)], which assumes each BMP acts independently; this is Method B.
Appendix O, Table 1 (BMP Efficiencies), Littoral Zone: gives “Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”; the handbook does not say how the littoral zone applies to ponds in series. Taking it on one pond only is BMPFast’s rule.
Worked example
Example Problem 5 (a 6 ac highway catchment, Florida Zone 5, 61 in of rain): annual runoff 16.68 ac-ft/yr. A total permanent pool of 4.571 ac-ft gives a total residence time of 100 days. Split equally, each pond holds 2.285 ac-ft.
| Step | Method A: one pond, 4.571 ac-ft | Method B: two ponds of 2.285 ac-ft |
|---|---|---|
| Residence time | 100 days | 50 days each |
| Nitrogen, each pond | 43.75 x 100 / 104.38 = 41.9 % | pond 1 (littoral): 40.2 %; pond 2 (no littoral): 40.2 x 0.90 = 36.2 % |
| Nitrogen, total | 41.9 % | 1 – (1 – 0.402)(1 – 0.362) = 61.9 % |
| Phosphorus, each pond | 74.0 % | pond 1: 68.3 %; pond 2: 68.3 x 0.90 = 61.5 % |
| Phosphorus, total | 74.0 % | 1 – (1 – 0.683)(1 – 0.615) = 87.8 % |
The two methods compared
The same total pool, split equally between the two ponds, for total residence times from 10 to 400 days. Every value was calculated by BMPFast.
| Total residence time (days) | Total pool (ac-ft) | A: N (%) | B: N (%) | A: P (%) | B: P (%) | B, both littoral: N / P (%) |
|---|---|---|---|---|---|---|
| 10 | 0.457 | 30.4 | 39.4 | 55.9 | 73.4 | 41.2 / 75.9 |
| 25 | 1.143 | 37.2 | 52.1 | 62.8 | 79.6 | 54.3 / 82.0 |
| 50 | 2.285 | 40.2 | 58.3 | 68.3 | 83.9 | 60.6 / 86.2 |
| 100 | 4.571 | 41.9 | 61.9 | 74.0 | 87.8 | 64.3 / 90.0 |
| 150 | 6.856 | 42.5 | 63.2 | 77.4 | 89.9 | 65.6 / 91.9 |
| 200 | 9.142 | 42.8 | 63.8 | 79.9 | 91.3 | 66.3 / 93.2 |
| 300 | 13.713 | 42.8 | 64.5 | 79.9 | 93.1 | 66.9 / 94.9 |
| 400 | 18.283 | 42.8 | 64.8 | 79.9 | 94.3 | 67.3 / 95.9 |


Splitting the pool unequally (method B, 100 days in total)
| Share of the pool in pond 1 | Pond 1 / pond 2 residence time (days) | N (%) | P (%) |
|---|---|---|---|
| 10 % | 10 / 90 | 56.5 | 84.9 |
| 25 % | 25 / 75 | 60.6 | 86.8 |
| 50 % | 50 / 50 | 61.9 | 87.8 |
| 75 % | 75 / 25 | 61.0 | 87.7 |
| 90 % | 90 / 10 | 57.7 | 86.6 |
Method A does not depend on the split: 41.9 % N and 74.0 % P at 100 days.
What the comparison shows
- Method B gives much more removal than Method A for the same total pool: 9 to 22 percentage points more nitrogen and 11 to 17 more phosphorus over 10 to 400 days. The pond equations rise quickly and then level off, so two half-size ponds, each on the steep part of the curve, remove more in a chain than one pond on the flat part.
- Method A stops rising at a total of 200 days, the 200-day limit of the combined pond (42.8 % N, 79.9 % P). In Method B each pond has its own 200-day limit, so the chain keeps rising up to 400 days.
- In Method B an equal split gives the most removal; a very unequal split gives less.
- Taking the littoral zone credit on both ponds (which BMPFast warns against) adds 1.6 to 2.5 more points.
- Method B treats the two ponds as independent, as Equation 9-5 assumes. Section 9.5.1 also says that where an upstream unit changes how a downstream unit performs (an “identifiable causal relationship”), the designer should consider another methodology. Method A, one pond with the combined pool, is such a methodology: the second pond receives water already settled in the first, so it may remove less than an independent pond.
Applicant’s Handbook reference
Appendix O, Wet Detention: residence time is the permanent pool volume divided by the annual runoff, times 365, with the TP and TN percent removal equations; both methods use these equations.
Appendix O, Wet Detention, Limits to Average Annual Residence Time throughout the State: the maximum is 200 days (79.9 % TP, 42.8 % TN); Method A applies it to the combined pond, Method B to each pond.
Applicant’s Handbook reference
Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): “If such a causal relationship exists where the BMP acts in combination with the upstream BMP, the designer should consider the use of another methodology”; the handbook does not name that method. Method A, one pond with the combined pool, is BMPFast’s choice for one pond in two cells.
Which to use. Use Method A when the two slots really are one pond (for example a pond in two connected cells). Use Method B for two separate ponds, and be ready to show the reviewing agency why the second pond performs independently of the first.
Sample problems
Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.
- BMPs in series: retention basin then wet pond
- BMPs in series: two retention basins
- BMPs in series: wet pond with stormwater harvesting
- BMPs in series: permeable pavement then wet pond
- BMPs in series: tree well, exfiltration and retention
Related pages
- Wet Detention: the worksheet.
- Wet Detention Methodology: the equations, the 200-day limit and the littoral zone, with their Handbook sources.
- BMPs in Series: several BMPs in one catchment.
- Routing: catchments routed one into another, and the Detention in Series strand.
- Comparison of Methods for Calculating Filters in Series: the same question for surface filters.
- Comparison of Methods for Calculating the Littoral Zone Credit.
- Comparison of Methods for Calculating Retention Followed by Wet Detention.