The Multiple BMP Worksheet (BMPs in Series) treats one catchment’s runoff with up to four BMPs one after the other: the runoff enters BMP 1, what BMP 1 discharges enters BMP 2, and so on, with no other runoff added between them. Examples are permeable pavement draining into an exfiltration trench, a rain garden draining into exfiltration, or a wet pond followed by a filter. BMPFast works out the annual removal of the whole series. It is not the sum of the separate removals: the same water cannot be captured twice, and the same pollutant cannot be removed twice.
If other runoff joins the flow between two BMPs, do not use this worksheet: put each BMP in its own catchment and connect the catchments on the Catchment Configuration (routing) screen.

Before you start
- In the catchment, enter each BMP you want in the series on its own worksheet (for example Retention, then Wet Detention) from the Treatment Options screen. Only BMPs that are already defined in this catchment appear in the BMP 1–4 lists, plus No Treatment. Multiple BMP itself is never offered.
- Open this worksheet with the BMPs in Series button on the Treatment Options screen.
- So that the series is used in the analysis, choose Multiple BMP as the BMP for this catchment on the routing screen (“Select BMP to use in routing:”).
The worksheet
The worksheet reads “Add up to 4 BMP’s in series to the catchment in order of routing”. Blue arrows run from BMP 1 down to BMP 4: BMP 1 is the most upstream.
| Control | What it does |
|---|---|
| BMP 1: … BMP 4: | Choose the BMP in each position, upstream to downstream. The lists contain the BMPs defined in this catchment and No Treatment. Fill the positions from the top without gaps; each BMP can be used only once. |
| Open (beside each BMP) | Opens that BMP’s own worksheet for this catchment, so you can check or change its inputs. Available only when the position holds a BMP. |
| Insert (beside each BMP) | Inserts a No Treatment placeholder at this position and moves this BMP and the ones below it one position down. Then choose the BMP you want in the new position. Available while fewer than four BMPs are in the series, at any filled position or the first empty one. |
| Remove (beside each BMP) | Removes the BMP at this position and moves the ones below it up one position. |
| Calculate | Calculates the catchment and the series and opens the Multiple BMP report in the Report Viewer (print or copy it from there). Disabled while the series breaks one of the rules below. |
| Equations | Calculates and opens the Multiple BMP Equations report (see below) in the Report Viewer. |
| Anoxic Depth | Appears when the last BMP of the series is a Wet Detention. Shows the pond’s Anoxic Depth report, calculated with the Multiple BMP’s overall P removal (see the Wet Detention help page for the equations). |
| Help | Opens this page. |
| Back | Saves the series, calculates it and closes the worksheet. |
Below the BMP boxes a line reports problems with the series (see Rules and messages). The status bar at the bottom of the window shows the project’s Maximum % Removal for TN and TP.
Equivalent Treatment group
When the series starts with retention BMPs and ends in one of the retention special cases below (Retention in Series, Retention to Wet Detention, Retention to Filtration), a group box titled Equivalent Treatment (case) appears on the worksheet. It shows:
- Equivalent Treatment Depth (in): the sum of the treatment depths of the retention BMPs at the head of the series.
- Equivalent Treatment Efficiency (%): the removal of that combined retention system, read from the retention efficiency lookup tables for the Equivalent Treatment Depth.
- The note: “When all upstream BMPs consist of Retention BMPs, the sum of the treatment depths are used to calculate efficiency. These are titled Equivalent Treatment Depth and Equivalent Treatment Efficiency.” followed by what happens next: for Retention to Wet Detention or Retention to Filtration, “The wet detention (filtration) is then applied to what this system passes on, which gives the treatment efficiency of the Multiple BMP.”; for Retention in Series, “There is no downstream BMP in this series, so this efficiency is also the treatment efficiency of the Multiple BMP.”
For any other series the group box is hidden.
Rules and messages
| Message | Cause |
|---|---|
| Note: (BMP) is chosen twice, so the series cannot be calculated. … | The same BMP is chosen in two positions; Calculate is off. Remove one of them. Only Wet Detention may repeat, and only in positions next to each other (the same pond, see below). |
| Note: Wet Detention is in two slots that are not next to each other, so the series cannot be calculated. … | For example Wet Detention, Retention, Wet Detention; Calculate is off. Put the Wet Detentions next to each other (the same pond), remove one, or model two different ponds with the Routing. |
| Note: Wet Detention in 2 slots in a row is the same pond, calculated with 2 x its permanent pool. … (in blue) | Wet Detention is chosen in positions next to each other. Allowed: a message explains it when you choose it, and the series is calculated as one pond with the summed pool. |
| Note: You cannot have a blank BMP or a No BMP routing to a valid BMP | An empty position above a filled one. Fill the positions from BMP 1 down, or use Remove to close the gap. |
| Note: Rainwater Harvesting (or Stormwater Harvesting) directly before a Wet Detention cannot be calculated and is not recommended. Change the series: … | Rainwater or Stormwater Harvesting is placed directly before a Wet Detention. This series is not allowed. Calculate is off, and Calculate, Back, closing the window or choosing another catchment shows the warning and stays on this screen until the series is changed: put the Wet Detention before the harvesting, remove one of them, or use the harvesting on its own as the catchment’s BMP. A project saved by an earlier version with such a series is still opened, but the series is given 0 removal when the project is calculated, and the Multiple BMP report and the Summary report carry a warning saying why, until the series is changed. |
| Choose at least one BMP in the series, then press Equations. | Equations was pressed with no BMP chosen. |
Source reference
BMPFast method (frmMultipleBMP; Ron, 2026-10-13 and 2026-10-16): refusing harvesting directly before a Wet Detention, and treating Wet Detention chosen in two positions next to each other as one pond with the summed pool, are BMPFast’s rules.
While any of the first three messages shows, Calculate is disabled and Equations explains the problem instead of opening the report.
How the series is calculated
Methodology. The Equivalent Treatment Depth of retention BMPs at the head of a series is explained with the other retention BMPs on Retention BMPs; the curves it is read on are on Retention Methodology.
BMPFast looks at the BMPs in the series and picks a calculation. It checks the cases in this order and uses the first that fits:
| Case (as named in the reports) | Series shape | How it is calculated |
|---|---|---|
| Retention in Series | Every BMP in the series is a retention-type BMP | One combined retention system: treatment depths summed, removal e from the retention lookup tables. N removal = P removal = hydraulic capture = e. |
| Wet Detention to Stormwater Harvesting | Wet Detention → Stormwater Harvesting (optionally followed by more BMPs); or one retention BMP → Wet Detention → Stormwater Harvesting | Treatment train; the harvesting’s removal also sets the hydraulic capture. |
| Retention to Wet Detention | One to three retention BMPs → Wet Detention as the last BMP | Combined retention system routed into the pond; the pond’s residence time is recalculated from the volume the retention passes on. |
| Retention to Filtration | One to three retention BMPs → Filtration (Surface Discharge Filter) as the last BMP | Combined retention system, then the filter’s own removal applied to what is left. |
| Generic Multiple BMP | Anything else | If it starts with retention BMPs: they are one combined retention system; a Wet Detention right after them is routed as in Retention to Wet Detention; each later BMP is added as a treatment train. Otherwise: each BMP in turn, loads chained from one BMP to the next. |
Retention-type BMPs are those that hold runoff and do not discharge it: Retention, Exfiltration, Permeable Pavement, Swale, Tree Well, Greenroof, Stormwater and Rainwater Harvesting, a Rain Garden set to Retention, and a Vegetated Natural Buffer or Vegetated Filter Strip set to Retention. Wet Detention, Filtration, User Defined BMP and No Treatment are not retention-type, and a No Treatment placeholder between two retention BMPs ends the combined retention system.
Applicant’s Handbook reference
Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): BMPs in series are combined as 1 − [(1 − Eff1) × (1 − Eff2) × …], which “assumes each BMP acts independently of upstream BMPs”; where there is “an identifiable causal relationship” between an upstream and a downstream unit, “the designer should consider the use of another methodology”. BMPFast uses Equation 9-5 for the generic series and a combined-system method for the special cases.
Appendix O, Directions for use: “BMPs designed in series will have their treatment efficiencies calculated by the formula listed in the BMP Treatment Train section”; Appendix O, Treatment Train repeats Equation 9-5.
Filters in series. Two or more Filtration BMPs one after the other are calculated as a treatment train: each filter removes its share of what the one before it lets through. How that compares with adding the filters’ equivalent Treatment Depths on the retention curves, step by step with numbers: Comparison of Methods for Calculating Filters in Series. For two filters with different media, the same two methods beside a third that BMPFast does not calculate (Specific Yield / Specific Retention): Comparison of Methods for Filter Media in Series. BMPFast 2 lets you choose either of its two methods for the filters from BMP 1 on (Surface discharge filters in series, on the series’ Entry tab).
Combined retention system (Equivalent Treatment Depth)
Consecutive retention BMPs at the head of the series act as one system. Without any added runoff, the downstream retention BMP captures water the upstream one could not, so the annual capture depends on their total treatment depth:
Equivalent Treatment Depth (in) = sum of the Treatment Depths of the retention BMPs
Equivalent Treatment Efficiency e (%) = retention lookup (Equivalent Treatment Depth, non-DCIA CN, DCIA %, rainfall zone)
Example (from the BMPFast example problems): a retention system with a treatment depth of 0.552 in captures 75%. Adding permeable pavement with a stand-alone treatment depth of 0.151 in (33% on its own) gives an Equivalent Treatment Depth of 0.552 + 0.151 = 0.703 in and a capture of 80%, not 75 + 33 = 108%.
Applicant’s Handbook reference
Appendix O, Dry Retention Systems: removal is read from the mean annual mass removal tables at the retention depth in inches over the catchment area, by zone, non-DCIA CN and DCIA; the handbook does not describe adding the treatment depths of retention BMPs in series. The Equivalent Treatment Depth is BMPFast’s method, used because a downstream retention BMP captures water the upstream one could not (the causal relationship of Section 9.5.1).
Source reference
BMPFast method (MultipleBMP.CalculateEquivalentRetentionDepth; retention-led series of every kind, Ron, 2026-10-01): retention BMPs at the head of a series, or retention BMPs in a routed strand, are one system: their Treatment Depths are added and the removal is read once from the retention tables.
FDEP and the water management districts (2010). Stormwater Quality Applicant’s Handbook: Design Requirements for Stormwater Treatment Systems in Florida, March 2010 draft (not adopted), Section 22.3 Dry Retention In Series, Table 22.3-2, notes 2 and 3 (the draft, not adopted: PDF, 16 MB): in its worked example the downstream basin’s efficiency is read from the dry retention tables at the sum of the two basins’ retention depths (2 in = 1.00 + 1.00 in; 1.89 in = 1.00 + 0.89 in), and the downstream basin is credited with the difference from the upstream basin’s efficiency; BMPFast’s Equivalent Treatment Depth adds the depths in the same way.
Other methods: the same problem solved by adding the Treatment Depths and by Equation 9-5, with a plot of how far apart they are: Comparison of Methods for Calculating Retention BMPs in Series.
Retention to Wet Detention
The pond receives only what the retention system discharges, so its residence time is longer than it would be on its own:
Volume to pond (ac-ft/yr) = Runoff x (100 - e) / 100
Effective Residence Time (days) = Permanent Pool Volume (ac-ft) / Volume to pond (ac-ft/yr) x 365
D = the pond's N or P removal at the Effective Residence Time (wet detention equations)
Pond series contribution (%) = (100 - e) x (D / 100 - a / 100 x e / 100), a = 10 for N, 20 for P (not below 0)
Removal (%) = e + pond series contribution
Applicant’s Handbook reference
Appendix O, Wet Detention: residence time is the permanent pool volume divided by the annual runoff inputs, times 365, and the TP and TN percent removal equations give the removal; using the runoff the retention system passes on as the pond’s input is BMPFast’s method, not described in the handbook.
Appendix O: has no adjustment for a pond downstream of retention; the factors a = 10 (N) and 20 (P) in the pond’s series contribution are BMPFast’s, not the handbook’s.
Source reference
BMPFast method (MultipleBMP.RouteRetentionToWetDetention, MultipleBMP.cs, about line 1316): the pond’s residence time uses only the volume the retention system passes on, and its share is reduced with adjustment factors of 10 (N) and 20 (P), marked in the code as “Temporary N/P Adjustment Factor”; the program gives no source for these factors.
Other methods: one problem solved by this route, by the routing and by Equation 9-5, with plots: Comparison of Methods for Calculating Retention Followed by Wet Detention.
Retention to Filtration
The filter keeps its stand-alone removal f (its capture from its own treatment depth and the watershed, times the media reduction), because a filter’s removal does not depend on the volume reaching it. It acts only on what the retention system did not remove:
Volume to filtration (ac-ft/yr) = Runoff x (100 - e) / 100
f = the filtration's stand-alone removal
Removal (%) = e + f x (1 - e / 100)
Filtration series contribution (%) = f x (100 - e) / 100
The result assumes the filter is large enough to treat the volume the retention system passes on; there is no partial credit for an undersized filter. The Surface Discharge Filter’s sizing takes that discharged volume into account.
Other methods: this method compared with adding the Treatment Depths, with a plot: Comparison of Methods for Calculating Retention Followed by a Surface Discharge Filter.
Wet Detention to Stormwater Harvesting
Removal (%) = E1 + E2 x (1 - E1 / 100) E1 = pond removal, E2 = harvesting removal
Hydraulic Capture (%) = the harvesting's N removal
Each further BMP: Removal (%) = E1 + E2 x (1 - E1 / 100), and its N removal sets the hydraulic capture
With a retention BMP ahead of the pond (Retention → Wet Detention → Stormwater Harvesting), the retention and pond are calculated as in Retention to Wet Detention, the harvesting is then added as a treatment train, and Hydraulic Capture (%) = harvesting N removal + previous capture × (1 − harvesting N removal / 100).
Generic series
When the series starts with retention BMPs, they form one combined retention system (removal e, as above). A Wet Detention right after them is routed as in Retention to Wet Detention. Every later BMP is added as a treatment train:
Treatment train: E (%) = E1 + E2 x (1 - E1 / 100)
Load out of each later BMP (kg/yr) = its load in x (100 - its removal) / 100
When the series does not start with a retention BMP, each BMP is applied in turn to the load leaving the one before it:
Load in (BMP k) = Load out (BMP k - 1)
Load out (kg/yr) = Load in x (100 - BMP removal) / 100
Removal (%) = 100 x (Load into BMP 1 - Load out of the last BMP) / Load into BMP 1
Example: a wet pond removing 40% of TN followed by a filter removing 50% gives 40 + 50 × (1 − 0.40) = 70% overall, not 90%.
Applicant’s Handbook reference
Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): the treatment-train steps above (Retention to Filtration, Wet Detention to Stormwater Harvesting, the later BMPs of a generic series, and each BMP in turn when the series does not start with retention) are Equation 9-5, written as E1 + E2 × (1 − E1 / 100) or as loads chained from one BMP to the next.
Wet Detention twice: the same pond. A catchment has only one Wet Detention, so choosing Wet Detention in two (or more) positions next to each other uses the same pond. BMPFast tells you so when you choose it, notes it on the screen and in the report, and calculates it as one pond with twice (or three or four times) its permanent pool: the residence time of the summed pool, then the pond’s 200-day limit, littoral zone and MAPs credit, each applied once. A wet pond in connected cells can be entered this way, or as one Wet Detention with the total pool. To model two different ponds in series, use the Routing: route the catchment to a second catchment that has no area of its own and only a Wet Detention BMP, the second pond. The two methods give different removals (two routed ponds remove more for the same total pool), as Comparison of Methods for Calculating Wet Detention Ponds in Series shows. Wet Detention in positions that are not next to each other (for example Wet Detention, Retention, Wet Detention) is not allowed.
Applicant’s Handbook reference
Appendix O, Wet Detention, Limits to Average Annual Residence Time throughout the State: the maximum is 200 days; for the same pond chosen twice BMPFast applies it once, to the residence time of the summed pool.
Appendix O, Table 1 (BMP Efficiencies), Littoral Zone: gives “Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”; BMPFast applies the littoral zone (and the MAPs credit) once for the pond. The handbook does not address one pond entered in two positions.
Results (the Calculate report)
- Multiple BMP in Series heading and Watershed Characteristics of the catchment.
- One table per BMP, BMP in Series Number: n (BMP Type: …), with that BMP’s input variables. For the pond in Retention to Wet Detention it adds the N and P series contributions and the Effective Residence Time; for the filter in Retention to Filtration it adds its stand-alone and series-contribution N and P efficiencies.
- Equivalent Treatment Depth and Efficiency (case) for the retention special cases: the two notes, Equivalent Treatment Depth (in), Equivalent Treatment Efficiency (%), and the Multiple BMP Provided N and P Treatment Efficiency (%).
- Surface Water Discharge: the Multiple BMP’s Provided Nitrogen and Phosphorus Treatment Efficiency (%) (shown as 99% if 100% or more).
- Load for Multiple BMP in Series: N, P and runoff in; treatment N, P and hydraulic capture (Q, %); surface discharge N, P and Q; mass reduction. When the project’s groundwater analysis is on, a groundwater part shows Retention into Media, Media GW Treatment, Total GW Discharge and Retained N and P.
The Equations report
Equations opens a report that shows how the result was reached, with the numbers actually used:
- System case: the case type and the calculation used, the series as a chain of segments (for example “Retention system (2 retention BMPs as one) → Routed wet detention”), and a table of each segment, the BMPs in it and how it is calculated.
- Equations and Notes for the calculation used (the equations above).
- Values: Scenario, Calculation used, runoff and N and P loads into the series, the Equivalent Treatment Depth and Efficiency (retention special cases), Hydraulic Capture, N and P removal of the Multiple BMP, and the N and P loads in the surface discharge.
- Calculation steps (values as used): every step in the order it was made, with the calculation and the numbers in it, and the result.
- One section per BMP, BMP n: name: its role in the series (for example “Part of the combined retention system: its Treatment Depth is added into the Equivalent Treatment Depth. Its own N and P removal below is not applied separately.”), its own equations and notes, and its values after the series calculation. A routed pond also lists its routed Effective Residence Time, its N and P removal at that time and its series contributions.
Notes and limits
- Up to four BMPs; each BMP can appear only once.
- Enter and check each BMP on its own worksheet first (use Open); this worksheet only arranges them.
- The order matters: BMP 1 receives the catchment’s runoff.
- A No Treatment placeholder left in the series removes nothing.
Background
The document below explains annual effectiveness for BMPs in series with worked examples. Where it differs from the method described above, the method above is what BMPFast calculates.
Comparison of methods
Several of the series on this page can be calculated more than one way. Each page below works one problem by each method and shows how far apart they are; each says which method BMPFast uses. Every number on them is from BMPFast or its retention curves.
- Comparison of Methods for Calculating Retention BMPs in Series — two or more retention BMPs one after the other in one catchment (BMPs in Series): their Treatment Depths added (one storage) or Equation 9-5, over a range of sizes.
- Comparison of Methods for Calculating Retention Followed by Wet Detention — a retention basin followed by a wet detention pond: BMPFast’s method, the routing and Equation 9-5, over a range of basin sizes.
- Comparison of Methods for Calculating Retention Followed by a Surface Discharge Filter — a retention basin followed by a filter: Equation 9-5 (what BMPFast uses) or the two as one storage, over a range of filter sizes.
- Comparison of Methods for Calculating Filters in Series — Surface Discharge Filters one after another, worked on two equal filters: the Handbook equation (Equation 9-5) or the Equivalent Treatment Depth (one system).
- Comparison of Methods for Filter Media in Series — two filters with different media, one after another: the Handbook equation and the Equivalent Treatment Depth, which BMPFast calculates, beside a third, Specific Yield / Specific Retention, which it does not (worked on the page from BMPFast’s retention curve, for a range of Specific Yield to Specific Retention ratios).
- Comparison of Methods for Calculating Wet Detention Ponds in Series — two wet detention ponds one after the other: the two ways BMPFast can model them, on one example.
- Comparison of Methods for Calculating the Littoral Zone Credit — a wet detention pond with a littoral zone: the Handbook’s credit of up to 10 % more removal, read two ways, with plots.
Sample problems
Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.