The Exfiltration Systems Worksheet is where you enter an exfiltration trench (a perforated pipe in a stone-filled trench) or a vault for the current catchment, and see how much of the average annual runoff, nitrogen and phosphorus it removes. Open it from Treatment Options with the Exfiltration Trench/Vault button. You enter the pipe and trench dimensions; BMPFast works out the storage volume, turns it into a treatment depth over the catchment, and reads the annual capture from the retention efficiency tables, the same way as a retention basin.

Description
Exfiltration is a subsurface structure to exfiltrate the stored water into the ground. The “ex” is intended to distinguish between surface (infiltration) and underground movement (exfiltration) of water into the ground. As examples, it can be a perforated pipe or a vault surrounded by natural rock or pollution control media. A vault typically has no media in the storage area. If the soils and water table allow, stored runoff exfiltrates to the groundwater.
How BMPFast calculates it. The Applicant’s Handbook, Appendix O, does not name exfiltration trenches or vaults. BMPFast treats exfiltration as a dry retention system, because the water is held and infiltrated, and looks up its removal in the dry retention tables, using its Treatment Depth. This is how BMPFast reads Appendix O, not something the Handbook says, so a reviewer may ask for the recovery calculation (that the treatment volume is recovered within 72 hours).
A typical section of a pipe is shown below with the design volume also known as the required treatment volume “RTV”. A recovery time of 72 hours is used for low hydraulic conductivity (such as no limestone) conditions in the left side of the diagram below.
There are procedures for estimating the recoverable volume for a design and operation when the ground layer is limestone (SFWMD, 2016). The design is usually consistent with the section shown on the right in the diagram below, with a water table at or below the pipe invert. The time for recovery is typically specified to be one or three hours. All designs must follow the applicant handbook calculations.

Hydraulic Conductivity Conditions
Low Hydraulic Conductivity

High Hydraulic Conductivity

In BMPFast you tell the program which case you have with Time to recover design volume: enter the design recovery time in hours (for example 72 for low conductivity, 1 to 3 for limestone).
Average Annual Capture Effectiveness
The average annual effectiveness in a high hydraulic conductivity rock layer (limestone exfiltration area) was calculated using the original work of Wanielista (1978).
An example of the average annual capture effectiveness for Region 2 expressed as a percentage of total rainfall (Y axis) is shown as a function of design treatment depth (X axis) (Wanielista and Yousef, 1993).
The top curve represents a recovery time of 3 hours, corresponding to the time interval for independent storm events in Florida, assuming no initial abstraction on the catchment (runoff = rainfall).
The capture effectiveness assumes exfiltration of every rainfall event up to the design depth plus at least the design depth for all rainfall events greater than the design depth.
Source reference
Wanielista, M.P. and Yousef, Y.A. (1993). Stormwater Management. John Wiley & Sons, New York: the source of the Region 2 capture curve shown above, the share of rainfall captured against design depth with a 3-hour recovery; BMPFast does not read this curve, but the dry retention tables plus the Recovery-Time Adjustment.
Wanielista, M.P. (1978): the original work on the annual capture of exfiltration systems in limestone that the curve is based on, as cited on this page.

Average annual capture effectiveness for Region 2 as a function of design treatment depth.
Adjustment for Initial Abstraction and Recovery Time
Harper (2007) adjusted the yearly capture to account for initial abstraction on the catchment and for a 72-hour recovery time using long-term simulation of rainfall/runoff.
Annual capture tables are published in the FDEP Applicant’s Handbook, Volume 1 (June 28, 2024) for design depths ranging from 0.25 to 4.0 inches. BMPFast uses these tables (72-hour recovery) and then adds a Recovery-Time Adjustment when the recovery time you enter is 36 hours or less (see Equations below).
Applicant’s Handbook reference
Appendix O, Dry Retention Systems: the tables run from 0.25 to 4.00 inches of design volume over the catchment area for each zone; Appendix O does not list exfiltration by name, and BMPFast reads these tables for the trench or vault volume because that volume is retained and infiltrated like a dry retention system. A reviewer may ask for the recovery calculation: that the volume is recovered within 72 hours.
Appendix O, Dry Retention Systems: the treatment volume must be recovered “within 72 hours or less, equivalent to the volume recovery period utilized for generation of the performance efficiency summarized in the tables”; BMPFast differs: for a recovery time of 36 hours or less it adds a Recovery-Time Adjustment that is not in the handbook.
For example, at a design depth of 1 inch, shortening the recovery from 72 hours to 3 hours raises the capture efficiency by about 7.5% in BMPFast (about 1.6% for a recovery time between 3 and 36 hours).
Source reference
Harper, H.H. and Baker, D.M. (2007). Evaluation of Current Stormwater Design Criteria within the State of Florida. Final report, FDEP Contract S0108, Appendix D and Sections 4.2.1 and 5.2.1.1 (link): the dry retention tables account for an initial abstraction of 0.1 in on directly connected impervious area and for a 72-hour recovery, by long-term simulation of rainfall and runoff.
BMPFast method (Storage.CalculateRecoveryDesignTimeAdjustment, Storage.cs; on the Equations page since 2026-10-02): the two polynomials for a recovery time of 3 hours or less and of 3 to 36 hours are BMPFast’s; the program does not give the study they were fitted to, and the retention tables themselves assume a 72-hour recovery.
Example Calculation
For a 1.2-acre catchment and a design depth of 1 inch, the design volume is 0.1 acre-foot (1 in × 1.2 acres ÷ 12 in/ft).
BMPFast is then used to calculate the average annual removal for the catchment conditions and location.
Pollution Control Media
Pollution control media may be used for exfiltration in areas where additional removal of nutrients is required before runoff waters enter the groundwater supply. In many applications, exfiltration systems are located beneath traffic areas or parking surfaces. Selected media must provide adequate structural support for vehicles or surface structures. In BMPFast, choose the media with the Media button (it appears only when the project does groundwater analysis). The media reduces the N and P reaching the groundwater; it does not change the surface discharge removal.
Inputs
| Input | Units | What it means / how it is used |
|---|---|---|
| Pipe Span (in): | inches | Inside width of the perforated pipe. Enter 0 when there is no pipe (a stone trench, or a vault). |
| Pipe Rise (in): | inches | Inside height of the pipe (equal to the span for a round pipe). Enter 0 when there is no pipe. |
| Pipe Length (ft): | feet | Length of perforated pipe. It should not be longer than the trench. |
| Trench/Vault Width (ft): | feet | Width of the trench or vault. The minimum is 3 ft, and it must be at least the Pipe Span + 12 inches (1 ft), for 6 inches of clearance on each side. |
| Trench/Vault Depth (ft): | feet | Depth of the trench or vault that holds water. The bottom of the trench/vault must not be below the water table; if it would be, use the depth to the water table (the note and tooltip beside the box say so). It must be at least the Pipe Rise + 12 inches, for 6 inches of clearance above and below the pipe. |
| Trench/Vault Length (ft): | feet | Length of the trench or vault. |
| Void space fraction not in pipe (0-1.0) : | fraction | The void (storage) fraction of the material around the pipe, as a fraction, not a percent (for example 0.25 for the pollution control media in the example below). For an empty vault, enter 1 minus the fraction of the interior taken up by walls and structures (for example 0.98). Values are kept between 0 and 1. |
| Time to recover design volume (0.2 – 72 hrs): | hours | How long the system takes to recover (empty) the design volume. A value from 0.2 to 36 hours raises the efficiency by the Recovery-Time Adjustment; above 36 hours there is no change. Values below 0.2 are taken as 0.2 and above 72 as 72. A blank box or 0 is taken as 72 hours (no adjustment). |
The catchment values (area, wet pond area, non-DCIA curve number, DCIA percent, rainfall zone, rainfall and EMCs) come from the Catchment Characteristics screen.
Example: pipe trench
- 100 feet of 36-inch perforated pipe: Pipe Span 36, Pipe Rise 36, Pipe Length 100
- Trench 4 feet wide × 6 feet deep × 100 feet long: Trench/Vault Width 4, Depth 6, Length 100
- Surrounded by pollution control media with a void space of 0.25 (fraction, not percent): Void space fraction 0.25
- Natural soils, recovery more than 3 hours: enter the design recovery time (for example 72)
- Result: Pipe Volume = 706.86 cf, Trench/Vault Volume = (4 × 6 × 100 − 706.86) × 0.25 = 423.29 cf, Treatment Volume = 1,130.14 / 43,560 = 0.026 ac-ft
Example: vault
- 40 ft × 40 ft × 8 ft deep vault, no pipe: Pipe Span 0, Pipe Rise 0, Pipe Length 0; Trench/Vault Width 40, Length 40, Depth 8
- Interior volume reduction of 0.02 (fraction, not percent): Void space fraction 0.98
- Surrounding rock is limestone, recovery less than 3 hours: enter the design recovery time (for example 1)
- Result: Treatment Volume = 40 × 40 × 8 × 0.98 / 43,560 = 0.288 ac-ft
Equations
Methodology. BMPFast treats this BMP as retention. Retention BMPs compares how every retention BMP calculates its Treatment Depth, and Retention Methodology explains the retention curves it is read on.
Pipe Volume (cf) = pi x (Pipe Span / 24) x (Pipe Rise / 24) x Pipe Length
Trench Volume (cf) = (Trench Width x Trench Depth x Trench Length - Pipe Volume) x Void Ratio
Treatment Volume (ac-ft) = (Pipe Volume + Trench Volume) / 43560
Treatment Depth (in) = Treatment Volume / Contributing Area (ac) x 12
- The Contributing Area is the whole post-development catchment area. There is no wet pond area with exfiltration, so a wet pond area entered for the catchment is not subtracted.
- Hydraulic capture efficiency is read from the retention efficiency lookup tables for the Treatment Depth, the watershed’s non-DCIA curve number, DCIA percent and rainfall zone (0 to 4 inches; a larger depth gets the 4-inch value).
- N and P removal are equal to the hydraulic capture efficiency.
- A Recovery-Time Adjustment for Time to Recover Design Volume is added to the capture efficiency and to N and P removal. N and P removal cannot exceed 100%.
Applicant’s Handbook reference
Appendix O, Table 1 (BMP Efficiencies), Retention Pond and Retention Systems: removal is based on the project’s DCIA, non-DCIA curve number and rainfall zone; BMPFast reads it from the tables with linear interpolation and uses it for both N and P.
Recovery-Time Adjustment
x = Treatment Depth (in), T = Time to Recover Design Volume (hr)
T <= 3 hr: Adjustment (%) = -0.1365 x^4 + 1.5228 x^3 - 5.0475 x^2 + 2.3674 x + 8.8133
3 < T <= 36 hr: Adjustment (%) = 0.0083 x^4 - 0.1518 x^3 + 1.0071 x^2 - 3.0705 x + 3.7676
Hydraulic Capture (%) = Lookup Table Capture (%) + Adjustment
N removal (%) = P removal (%) = Lookup Table Capture (%) + Adjustment
No adjustment is made when T is not entered (0) or is greater than 36 hours. A negative adjustment is set to 0. N and P removal cannot exceed 100%.
Results (the report)
- Exfiltration System Input Variables: the seven dimensions you entered, then Pipe Volume (cf), Trench/Vault Volume (cf), Treatment Volume (ac-ft) and Treatment Depth (in over the contributing area; the value appears twice, once as “in over CA”), and the Time to Recover Design Volume (hr). Below the table, a Warning line for each trench geometry rule the dimensions break (see Sizing), then “The removal was calculated with the dimensions as entered”: the worksheet warns but still calculates.
- Watershed Characteristics: Watershed Area, Contributing Area to BMP, Non-DCIA Curve Number, DCIA Percent, Rainfall Zone and Rainfall, from the catchment.
- Surface Water Discharge: Provided Nitrogen and Phosphorus Treatment Efficiency (%), shown at most 99%.
- Media Mix Information (when a media mix is selected) and Groundwater Discharge (Stand-Alone) (when groundwater analysis is on or a media mix is selected): the Average Annual Recharge (MG/yr infiltrated), and the TN and TP mass loads (kg/yr) and concentrations (mg/L) reaching the groundwater.
- Surface Discharge Load Diagram (stand-alone, this catchment only): load in, treatment (%), surface discharge out and mass reduction for N, P and runoff volume.
Buttons
| Button | What it does |
|---|---|
| Calculate / Equations / Report | After you change an input the button reads Calculate: a click reads the boxes, calculates and shows the report. Once the report is current it reads Equations and shows the Equations page (the equations, notes, the current values and the Recovery-Time Adjustment section with the curve used); it then reads Report to switch back. |
| Media | Opens the Media Mix form. Shown only when the project does groundwater analysis. |
| Sizing | Opens the Sizing window (below). |
| Cost | Opens the Cost Analysis for this system. |
| Opens the report in the Report Viewer. | |
| Plot | Opens the “Exfiltration (retention) System Efficiency” chart: efficiency against treatment depth from 0 to 4 inches for this catchment, with a marker at the current design. The curve is the lookup-table efficiency, without the recovery-time adjustment. |
| Help | Opens this page. |
| Back | Reads the boxes, calculates, saves to the project and closes the worksheet. |
Sizing
How the Sizing window works, for every BMP, is on Sizing.
The Sizing window finds trench dimensions that meet your N and P removal targets. Its sizing variables are Pipe Span (in, step 6), Pipe Rise (in, step 6), Pipe Length (ft, step 10), Trench Length (ft, step 10, minimum 10), Trench/Vault Width (ft, step 0.5, minimum 3), Trench Depth (ft, step 0.5, minimum 1) and Void Ratio (step 0.05, 0.05 to 1). Trench Length is plotted first; choose any other variable as the X-axis, or “None (values only)”. The window plots N and P removal against the chosen variable with the target lines (starting at the project’s Maximum % Removal), the current design and the point where both targets are met; Use sets the variable to that point. The line under the values shows the resulting treatment depth (the tables stop at 4 inches). Apply keeps the new values; Cancel puts back the ones you had.
The Sizing window refuses a value that breaks the trench geometry rules and says why: “Pipe Span requires a 6 inch clearance with each trench edge”, “Minimum Trench/Vault Width is 3 ft.”, “Trench/Vault Depth must have a 6 inch clearance with the trench top and bottom” and “Pipe Length cannot exceed Trench Length.” The worksheet itself does not stop you, but the report shows a warning for each rule that is broken.
Notes
- The system counts as entered (shown as defined on Treatment Options) once its treatment depth is greater than 0.
- The bar along the bottom of the window shows the project’s Maximum % Removal for TN and TP: the removal your analysis type requires.
In BMPFast 2
Recovery-time credit. In BMPFast 2 the Recovery-Time Adjustment is a choice on the Entry tab, Recovery-time credit: None (Appendix O tables only), the default, or Add BMPFast’s credit (36 hours or less) (Ron Eaglin, October 19, 2026). It is BMPFast’s own credit beyond the Applicant’s Handbook, Appendix O, which ties the retention tables to recovery within 72 hours and gives no credit for faster recovery; no published source has been found for its curves (Retention Methodology), so the permitting agency may not accept it. With None, the removal matches the Appendix O tables exactly. BMPFast (v1) always adds it when the time to recover is 36 hours or less.
Values outside the tables. BMPFast 2 still calculates, but shows a red warning, OUTSIDE THE LIMITS OF THE METHODOLOGY, when the Treatment Depth is above 4.00 in or below 0.25 in, or the catchment’s non-DCIA curve number is outside 30 to 98, or its DCIA is below 5 % (how BMPFast reads beyond the tables).
Comparison of methods
Exfiltration is calculated as a dry retention system, so the comparisons for retention BMPs apply to it too: read “retention basin” as the exfiltration trench or vault. Each page below works one problem by each method and shows how far apart they are; each says which method BMPFast uses. Every number on them is from BMPFast.
- Comparison of Methods for Calculating Retention BMPs in Series — two or more retention BMPs one after the other in one catchment (BMPs in Series): their Treatment Depths added (one storage) or Equation 9-5, over a range of sizes.
- Comparison of Methods for Calculating Retention Followed by Wet Detention — a retention basin followed by a wet detention pond: BMPFast’s method, the routing and Equation 9-5, over a range of basin sizes.
- Comparison of Methods for Calculating Retention Followed by a Surface Discharge Filter — a retention basin followed by a filter: Equation 9-5 (what BMPFast uses) or the two as one storage, over a range of filter sizes.
- Strand Based Routing for Retention in Series — retention catchments routed one into another: Treatment Depth Allocation (BMPFast 2’s default), Equation 9-5 or the Treatment Depths added, over a range.
Sample problems
Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.