The Permeable Pavement Worksheet is where you enter a permeable pavement system for the current catchment and see how much of the average annual runoff, nitrogen and phosphorus it removes. Open it from Treatment Options with the Permeable Pavement button. You enter the pavement area and the thickness of each pavement and reservoir layer; BMPFast works out the storage in the voids, turns it into a treatment depth over the catchment, and reads the annual capture from the retention efficiency tables.

Description
Permeable pavement allows the infiltration of water while providing structural support. The pavement system includes subsoil, reservoir, and the pervious pavement. They can include several types of materials or designed systems such as:
- Pervious concrete
- Pervious aggregate/binder products
- Pervious paver systems
- Modular paver systems
Recent studies on the design, longevity, and infiltration characteristics of permeable pavement systems are available on the University of Central Florida’s website:
http://stormwater.ucf.edu/
Included in these studies are data on the sustainable void spaces.
Pollution control media that is traffic-bearing can be used in the reservoir.
BMPFast always calculates permeable pavement as a retention system; there is no detention option. They are typically part of a treatment train to reduce stormwater volume and pollutant load from parking lots or similar types of areas.
Applicant’s Handbook reference
Appendix O, Pervious pavement: says the nutrient reduction “can be calculated in the same way as Dry Retention System”; BMPFast does this, using the storage in the sustainable voids as the retention volume.
Section 2.0 Definitions and Terms, “Retention”: lists “pervious pavement with subgrade” as an example of a retention system.
As with all infiltration BMPs, the treatment efficiency is based on the amount of annual runoff volume infiltrated, which depends on:
- Available storage volume within the pavement system
- Underlying soil permeability
- Ability of the system to recover storage volume
The volume of storage reduces over time due to the build-up of solids. Therefore, a sustainable void space is used and included within the BMPFast software.
A cross-section of a permeable pavement is shown below.

Inputs
The following must be specified: the permeable pavement area, the reservoir cross section, the type of pavement and the type of reservoir aggregate. On the worksheet:
| Input | Units | What it means / how it is used |
|---|---|---|
| Permeable Pavement Area (ac): | acres | Plan area of the permeable pavement. It multiplies every layer’s storage. It must be less than the catchment area. It can also be entered on the Edit Pavement Types screen. |
| Storage (ac-ft): | ac-ft | Read only. The total storage in the voids of all the layers, calculated from the area and the layers (see Equations). Updated when you click Calculate. |
| Time to recover design volume (0.2 – 72 hrs): | hours | How long the system takes to recover (empty) the storage. A value from 0.2 to 36 hours raises the efficiency by the Recovery-Time Adjustment; above 36 hours there is no change. Values below 0.2 are taken as 0.2 and above 72 as 72. A blank box or 0 is taken as 72 hours (no adjustment). |
| Edit Pavement Types and Depths | (button) | Opens the Edit Permeable Pavement Types screen, where you enter the thickness of each layer (below). |
Edit Permeable Pavement Types (layers)
This screen (the same screen as the Permeable Pavement Storage calculator under Tools) lists every pavement and reservoir material, with the names as they appear on screen, with its Sustainable Void (%). Type the Thickness (in) of each layer your system has; leave the others at 0. The void percentages are fixed. For a material with a different void, use a “User Defined” row with the nearest void (5, 20, 25 or 30%). The screen also has the Surface Area (ac) and shows the resulting Storage (ac-ft).
| Type | Sustainable Void (%) |
|---|---|
| Concrete Permeable Pavement | 25 |
| FilterPaveTM | 20 |
| FirmaPaveTM | 20 |
| FlexiPaveTM | 20 |
| PowerBLOCK(TM) | 5 |
| #57 rock(non-calcareous) | 21 |
| #89 pea rock | 25 |
| #4 rock | 24 |
| Recycled (crushed) concrete | 21 |
| Bold and GoldTM | 20 |
| Other Reservoir Space | 95 |
| BelgardTM | 20 |
| User Defined(5) | 5 |
| User Defined(20) | 20 |
| User Defined(25) | 25 |
| User Defined(30) | 30 |
- Calculate: works out the storage and shows it.
- Copy: copies the table (type, void and thickness) to the clipboard as tab-separated text.
- Back: keeps the area and thicknesses you entered, calculates, and returns to the worksheet. Closing the window any other way (Esc, X) keeps them too. Opened from Tools (the Permeable Pavement Storage calculator, titled “not saved”), nothing is saved: use Copy first if you want to keep the table.
Source reference
BMPFast method (pavement types, PerviousPavement.cs): the sustainable void percentages of each pavement and aggregate are built into the program; this page points to the UCF Stormwater Management Academy studies for them, but the study behind each value is not given.
For this example, the following inputs are used:

The storage calculated from this input is 3.95 ac × (4 in × 5% + 8 in × 21% + 3 in × 25% + 2 in × 20%) ÷ 12 = 3.95 × 3.03 in ÷ 12:
1.00 acre-foot
The resulting retention effectiveness is:
68%

Equations
Methodology. BMPFast treats this BMP as retention. Retention BMPs compares how every retention BMP calculates its Treatment Depth, and Retention Methodology explains the retention curves it is read on.
Layer Storage (ac-ft) = Surface Area (ac) x Layer Thickness (in) x Layer Void (%) / 100 / 12
Storage (ac-ft) = sum of the Layer Storage of every layer
Treatment Depth (in) = Storage / Watershed Area (ac) x 12
- The Watershed Area is the full catchment (post-development) area, including the pavement. The report’s Contributing Area to BMP is the watershed area minus the pavement area; it is not used for the Treatment Depth.
- Hydraulic capture efficiency is read from the retention efficiency lookup tables for the Treatment Depth, the watershed’s non-DCIA curve number, DCIA percent and rainfall zone (0 to 4 inches; a larger depth gets the 4-inch value).
- N and P removal are equal to the hydraulic capture efficiency.
- A Recovery-Time Adjustment for Time to Recover Design Volume is added to the capture efficiency and to N and P removal. N and P removal cannot exceed 100%.
Recovery-Time Adjustment
x = Treatment Depth (in), T = Time to Recover Design Volume (hr)
T <= 3 hr: Adjustment (%) = -0.1365 x^4 + 1.5228 x^3 - 5.0475 x^2 + 2.3674 x + 8.8133
3 < T <= 36 hr: Adjustment (%) = 0.0083 x^4 - 0.1518 x^3 + 1.0071 x^2 - 3.0705 x + 3.7676
Hydraulic Capture (%) = Lookup Table Capture (%) + Adjustment
N removal (%) = P removal (%) = Lookup Table Capture (%) + Adjustment
No adjustment is made when T is not entered (0) or is greater than 36 hours. A negative adjustment is set to 0. N and P removal cannot exceed 100%. For example, at a treatment depth of 1 inch the adjustment is about 7.5% (T ≤ 3 hr) or 1.6% (3 < T ≤ 36 hr).
Applicant’s Handbook reference
Appendix O, Dry Retention Systems: the design volume is expressed as inches over the catchment area and read on the tables from 0.25 to 4.00 inches with linear interpolation; BMPFast divides the storage by the whole catchment area, pavement included.
Appendix O, Dry Retention Systems: the treatment volume must be recovered “within 72 hours or less, equivalent to the volume recovery period utilized for generation of the performance efficiency summarized in the tables”; BMPFast differs: for a recovery time of 36 hours or less it adds a Recovery-Time Adjustment that is not in the handbook.
Appendix O, Table 1 (BMP Efficiencies), Green Stormwater Infrastructure Efforts: Pervious Pavement Systems may “add an additional removal based on plant, soil and media selections”; in BMPFast a media mix changes only the groundwater results, not the surface discharge removal.
Source reference
BMPFast method (PerviousPavement.cs; Ron, 2026-10-09): spreading the storage over the whole watershed area, pavement included, is BMPFast’s choice; Retention and Exfiltration use the contributing area.
BMPFast method (Storage.CalculateRecoveryDesignTimeAdjustment, Storage.cs; on the Equations page since 2026-10-02): the two polynomials for a recovery time of 3 hours or less and of 3 to 36 hours are BMPFast’s; the program does not give the study they were fitted to, and the retention tables themselves assume a 72-hour recovery.
Results (the report)
- Permeable Pavement Design Values: Pavement Surface Area (acres), Total Storage of Pavement (ac-ft), Watershed Area (acres), Treatment Depth (in) and Time to Recover Design Volume (hr), with a note on how the Treatment Depth is calculated.
- Pavement Layers: each layer with a thickness, its Sustainable Void (%), thickness (in), storage (in over the pavement) and storage (ac-ft), and the totals.
- Watershed Characteristics: Watershed Area, Contributing Area to BMP, Non-DCIA Curve Number, DCIA Percent, Rainfall Zone and Rainfall.
- Surface Water Discharge: Provided Nitrogen and Phosphorus Treatment Efficiency (%), shown at most 99%.
- Media Mix Information (when a media mix is selected) and Groundwater Discharge (Stand-Alone) (when groundwater analysis is on or a media mix is selected): the Average Annual Recharge (MG/yr infiltrated), and the TN and TP mass loads (kg/yr) and concentrations (mg/L) reaching the groundwater.
- Surface Discharge Load Diagram (stand-alone, this catchment only): load in, treatment (%), surface discharge out and mass reduction for N, P and runoff volume.
Buttons
| Button | What it does |
|---|---|
| Edit Pavement Types and Depths | Opens the layer screen described above. |
| Calculate / Equations / Report | After you change an input the button reads Calculate: a click reads the boxes, calculates, updates Storage and shows the report. Once the report is current it reads Equations and shows the Equations page (the equations, notes, the watershed values, Treatment Depth, Hydraulic Capture, Treatment Rate, N and P removal, and the Recovery-Time Adjustment section with the curve used); it then reads Report to switch back. The Equations page does not list the pavement area and layer thicknesses. |
| Media | Opens the Media Mix form to choose pollution control media for the water that infiltrates to the groundwater. |
| Sizing | Opens the Sizing window (below). |
| Cost | Opens the Cost Analysis for this pavement. |
| Opens the report in the Report Viewer. | |
| Plot | Opens the “Permeable Pavement (retention) System Efficiency” chart: efficiency against treatment depth from 0 to 4 inches for this catchment, with a marker at the current design. The curve is the lookup-table efficiency, without the recovery-time adjustment. |
| Help | Opens this page. |
| Back | Reads the boxes, calculates, saves to the project and closes the worksheet. |
Sizing
How the Sizing window works, for every BMP, is on Sizing.
The Sizing window keeps your layers and scales them all together. Its sizing variables are Pavement Surface Area (acres, step 0.05, minimum 0.01) and Layer Scale Factor (step 0.1, minimum 0.05). The factor starts at 1.0, your layers as entered; 1.5 makes every layer half again as thick, 0.8 makes every layer 20% thinner. (With no layers entered, sizing starts from 12 in of User Defined(20); with no area entered, from one tenth of the catchment.) Layer Scale Factor is plotted first, and the notes list the layers being scaled and their total thickness at the current factor. In this window the equations are:
Storage (ac-ft) = Surface Area (ac) x Sum over layers [Layer Thickness (in) x Sustainable Void (%) / 100] x Layer Scale Factor / 12
Treatment Depth (in) = Storage / Watershed Area (ac) x 12
The window plots N and P removal against the chosen variable with the target lines (starting at the project’s Maximum % Removal), the current design and the point where both targets are met; Use sets the variable to that point. A Surface Area equal to or larger than the catchment is refused (“Pavement Surface Area must be less than the catchment area”).
Apply multiplies each layer thickness by the factor (rounded to 0.01 in), so your pavement and aggregate types stay as they are. For example, 6 in of Concrete Permeable Pavement and 8 in of #57 rock at a factor of 1.5 become 9 in and 12 in. Cancel (or closing the window) leaves your layers unchanged.
Notes
- The pavement counts as entered (shown as defined on Treatment Options) once its treatment depth is greater than 0, that is, once it has an area and at least one layer thickness.
- Opening this worksheet marks the project as changed, so BMPFast asks you to save when you exit.
- The bar along the bottom of the window shows the project’s Maximum % Removal for TN and TP: the removal your analysis type requires.
- The Permeable Pavement Storage calculator under Tools does the same storage calculation without changing the project.
In BMPFast 2
Recovery-time credit. In BMPFast 2 the Recovery-Time Adjustment is a choice on the Entry tab, Recovery-time credit: None (Appendix O tables only), the default, or Add BMPFast’s credit (36 hours or less) (Ron Eaglin, October 19, 2026). It is BMPFast’s own credit beyond the Applicant’s Handbook, Appendix O, which ties the retention tables to recovery within 72 hours and gives no credit for faster recovery; no published source has been found for its curves (Retention Methodology), so the permitting agency may not accept it. With None, the removal matches the Appendix O tables exactly. BMPFast (v1) always adds it when the time to recover is 36 hours or less.
Values outside the tables. BMPFast 2 still calculates, but shows a red warning, OUTSIDE THE LIMITS OF THE METHODOLOGY, when the Treatment Depth is above 4.00 in or below 0.25 in, or the catchment’s non-DCIA curve number is outside 30 to 98, or its DCIA is below 5 % (how BMPFast reads beyond the tables).
Sample problems
Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.