Wet Detention Methodology

A wet detention pond holds a permanent pool of water. Runoff enters the pond, displaces water already there, and leaves through the outlet. While it is in the pool, settling, plant uptake and other processes remove part of its nitrogen and phosphorus. No water is kept back: all of the runoff that enters leaves again. So BMPFast does not use a capture for a wet pond, as it does for retention (Retention Methodology). The removal depends on how long the runoff stays in the pond: the average annual residence time. This page explains how BMPFast calculates that time, the removal equations, the littoral zone and floating wetland (MAP) adjustments, and where wet detention is used with other BMPs. The worksheet itself is described on Wet Detention.

What the removal depends on

ParameterUnitsMeaning
Permanent Pool Volumeac-ftThe volume of water held below the outlet’s control elevation.
Annual runoff volumeac-ft/yrThe average yearly volume of runoff that reaches the pond.
Average annual residence time (ART)daysHow long, on average, runoff stays in the permanent pool.
Littoral zoneyes / noWhether the pond has a planted shelf around its edge. In BMPFast 2 a pond with one adds a credit; in BMPFast (version 1) a pond without one has its removal reduced (step 3).
Littoral zone credit (BMPFast 2)percentage pointsThe removal added for the littoral zone, 0 to 10, entered by the designer (10 unless the littoral zone is smaller than AH Volume II asks).
Floating Wetland or other MAPs Credit%Extra removal granted for floating wetland mats or other managed aquatic plants, applied to the load the pond does not remove.
Result: N and P removal%The mean annual percentage of the nitrogen and phosphorus load removed.

Inputs: where the program gets each value

InputWhere it comes from
Permanent Pool VolumeEntered on the Wet Detention worksheet. The pond does nothing while it is 0.
Annual runoff volumeCalculated from the catchment: Runoff (ac-ft/yr) = Post-development Rational Coefficient × (Post Area − BMP Area) (ac) × Rainfall (in) / 12. The rational coefficient comes from the zone’s table for the post-development Non-DCIA CN and DCIA percent, and the BMP Area is the pond’s own area, which gives no runoff to treat (Catchment Characteristics).
Littoral zoneBMPFast version 1: the worksheet’s “Check if there is a littoral zone” box. BMPFast 2: the pond’s Entry tab, “How the littoral zone counts” (Littoral zone credit, the default, or Reduce without a littoral zone, v1’s method), “There is a littoral zone”, and “Littoral zone credit” (percentage points; shown only when How the littoral zone counts is Littoral zone credit and There is a littoral zone is Yes).
MAPs creditThe worksheet’s “Floating Wetland or other MAPs Credit (%)” box, from 0 to 100.
200-day capThe worksheet’s “Check if an ART can be over 200 days” box. Clear (the default): the residence time is capped at 200 days.

Applicant’s Handbook reference

Section 9.2.1 Calculating Predevelopment and Post-development Hydrology (Equation 9-1): annual runoff volume = area × average annual rainfall × ROC × 1/12, with the ROC from Appendix N for the zone, non-DCIA CN and DCIA; BMPFast uses this equation, with the pond’s own area left out of the area that produces runoff, which the handbook does not say.

The method

BMPFast applies these steps in this order. They are the equations the worksheet’s Equations page shows.

1. Residence time   ART (days) = Permanent Pool Volume (ac-ft) / Annual Runoff Volume (ac-ft/yr) × 365
capped at 200 days unless "ART can be over 200 days" is ticked
2. Pond removal N removal (%) = 43.75 × ART / (4.38 + ART)
P removal (%) = 40.13 + 6.372 × ln(ART) + 0.213 × [ln(ART)]²
3. Littoral zone BMPFast 2: with a littoral zone, N removal = N removal + Littoral zone credit (0 to 10 points; P the same);
without one, no change
BMPFast v1 (and BMPFast 2's v1 choice): without a littoral zone, N removal = N removal × 0.90 (P the same)
4. MAPs credit N removal = N removal + Credit × (100 − N removal) / 100 (P the same)
5. Limit N and P removal are not more than 100 % and not less than 0 %
6. No runoff ART 0 (no runoff reaches the pond): N and P removal are 0, with no credits
  • Step 2 uses the natural log (ln). Nitrogen removal rises quickly and then levels off: it never goes above 43.75 %, and reaches 42.8 % at 200 days. Phosphorus removal keeps rising slowly: 79.9 % at 200 days.
  • Step 3, the littoral zone. BMPFast 2 (Ron, October 20, 2026: “This will be a 10% credit for having a littoral zone, it is no longer a penalty”): the equations are a pond without a littoral zone, and a pond with a planted littoral zone adds the credit the designer enters, up to 10 percentage points, to both N and P. A 40 % pond with the full credit removes 50 %. BMPFast (version 1): the equations are a pond with a littoral zone, and a pond without one (for example a vertical-sided pond) gets 90 % of their removal; BMPFast 2 keeps this as the choice “Reduce without a littoral zone (v1)”. A v1 project opened in BMPFast 2 uses the credit, and BMPFast 2 says so when it opens it.
  • Step 4, the MAPs credit, applies to what is left after steps 2 and 3. A 20 % credit on a pond that removes 40 % adds 20 % of the remaining 60 %, which is 12 percentage points.
  • Volume. The volume leaving the pond equals the volume entering it. The loads leaving are the loads entering times (100 − removal) / 100.
  • The report also gives the Permanent Pool Volume for 31 days residence = 31 × Annual Runoff Volume / 365: the pool that would give a 31-day residence time.
  • Step 6. The P equation cannot be worked out at an ART of 0 (ln 0) and is negative below about 0.0001 day. When no runoff reaches the pond (a rainfall of 0, or a catchment with no area), BMPFast sets the N and P removal to 0, gives no littoral or MAPs credit, and the worksheet report says: “No runoff reaches the pond, so the residence time cannot be calculated: the N and P removal are 0.” Neither equation goes below 0.

Applicant’s Handbook reference

Appendix O, Wet Detention: residence time is the permanent pool volume (all the water below the control elevation) divided by the annual runoff, times 365; BMPFast computes the ART the same way (step 1).

Appendix O, Wet Detention, TP and TN percent removal equations: TP = 40.13 + 6.372 ln(t) + 0.213 [ln(t)]² and TN = 43.75 t / (4.38 + t); BMPFast uses these equations unchanged (step 2). Steps 5 and 6 are BMPFast’s own limits; the handbook does not give them.

Source reference

Harper, H.H. and Baker, D.M. (2007). Evaluation of Current Stormwater Design Criteria within the State of Florida. Final report, FDEP Contract S0108, Section 5.2.2, Figures 5-9 and 5-10 (pages 5-38 and 5-39) (link): the TP and TN removal equations are the best-fit relationships between removal and residence time for Florida wet detention ponds (R² 0.897 for TP, 0.800 for TN); the handbook adopts them and BMPFast uses them unchanged.

BMPFast method (WetDetention.cs; Ron, 2026-10-05, 2026-10-13 and 2026-10-20): steps 3 to 6, the littoral zone credit (BMPFast 2) or the 0.90 factor for no littoral zone (BMPFast v1), the MAPs credit on what the pond leaves, the 0 to 100 % limits and 0 removal when no runoff reaches the pond, are BMPFast’s.

Sources of the 200-day limit and the littoral zone, and ponds in series

The 200-day limit. ERP Applicant’s Handbook Volume I (effective June 28, 2024), Appendix O, Traditional BMP Treatment Efficiencies, Wet Detention, “Limits to Average Annual Residence Time throughout the State”: “Maximum Average Annual Residence Time: 200 Days. Maximum Treatment Efficiency for TP at 200 days: 79.9. Maximum Treatment Efficiency for TN at 200 days: 42.8. Designers may use a longer maximum residence time if they provide evidence to support it.” The last sentence is what “ART can be over 200 days” is for: tick it only when you can give the reviewing agency that evidence.

The littoral zone. ERP Applicant’s Handbook Volume I (effective June 28, 2024), Appendix O, Table 1 (BMP Efficiencies), the Littoral Zone row: “Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”, from DB Environmental, Inc. (2005), Quantifying the Effect of a Vegetated Littoral Zone on Wet Detention Pond Pollutant Load Reduction. A littoral zone is “that portion of a stormwater management system that is designed to contain rooted emergent plants” (Applicant’s Handbook Volume I, section 2.0, definition 69). BMPFast 2 applies the 10 % as a credit for a pond with a littoral zone: up to 10 percentage points added to the equations’ removal, entered by the designer (step 3; decided 2026-10-20). BMPFast version 1 applies it as a reduction for a pond without one, which gets 90 % of the removal of the equations (decided 2026-10-05).

Wet ponds in series. When two or more wet ponds are routed in series (one catchment’s pond discharges to the next catchment’s pond), the littoral zone credit can be applied only once. If more than one pond in the series is marked as having a littoral zone, BMPFast warns you on the Wet Detention worksheet (when you tick the box, click Calculate, or click Back, which offers to keep the window open), and the Wet Detention, Summary, Complete and AH Vol 1 reports carry the warning. The calculation itself is not changed: untick “Check if there is a littoral zone” on every pond in the series but one, keeping it on the most upstream pond (in BMPFast 2, set “There is a littoral zone” to No on the others). Where ponds branch (two ponds draining to a third), the credit can be taken only once along any one flow path.

Applicant’s Handbook reference

Appendix O, Wet Detention, Limits to Average Annual Residence Time throughout the State: a 200-day maximum (79.9 % TP, 42.8 % TN) unless the designer gives evidence for longer; BMPFast caps the ART at 200 days unless “ART can be over 200 days” is ticked.

Appendix O, Table 1 (BMP Efficiencies), Littoral Zone: “Maximum 10% removal with a minimum littoral zone area as described in AH Volume II”; BMPFast 2 takes the equations as a pond without a littoral zone and adds up to 10 percentage points with one; BMPFast version 1 differs in form: it takes the equations as the removal of a pond with a littoral zone and multiplies the removal by 0.90 when there is none. The handbook does not say how the credit applies to ponds in series.

Appendix O, Table 1 (BMP Efficiencies), Floating islands/managed aquatic plant systems (MAPS): “12% removal with 5 % pond coverage based on harvesting at least every 12 months”; BMPFast uses the credit the reviewing agency grants and does not limit it to this value.

Source reference

DB Environmental, Inc. (2005). Quantifying the Effect of a Vegetated Littoral Zone on Wet Detention Pond Pollutant Load Reduction (as cited in Appendix O, Table 1): the source of the handbook’s 10 % littoral zone credit; BMPFast 2 adds it, up to 10 percentage points, for a pond with a littoral zone (Ron, 2026-10-20); BMPFast version 1 applies it as a 0.90 factor for a pond without one (Ron, 2026-10-05); both allow it once per series (Ron, 2026-10-16).

FDEP and the water management districts (2010). Stormwater Quality Applicant’s Handbook: Design Requirements for Stormwater Treatment Systems in Florida, March 2010 draft (not adopted), Section 14.2, Table 14.1 (Nutrient Removal Credits for MAPS) (the draft, not adopted: PDF, 16 MB): proposed 10 % TN and TP for a littoral zone and 20 % to 40 % for floating wetland mats or islands, applied with the treatment train equation; BMPFast applies the MAPs credit to the load the pond leaves and does not limit the value typed.

Which pond keeps the littoral zone credit (Ron Eaglin, October 19, 2026). In series, the most upstream pond keeps it; ponds in parallel, on separate branches, may each keep it with their own catchment. Along any one flow path it counts once. The reports warn when more than one pond on a flow path has it.

Worked example

A pond with a 5.0 ac-ft permanent pool, 12.0 ac-ft/yr of runoff, no littoral zone and a 20 % MAPs credit:

StepNitrogenPhosphorus
1. ART = 5.0 / 12.0 × 365 = 152.08 days
2. Pond removal43.75 × 152.08 / (4.38 + 152.08) = 42.53 %40.13 + 6.372 × 5.024 + 0.213 × 5.024² = 77.52 %
3a. BMPFast 2: no littoral zone, so no credit42.53 %77.52 %
4a. BMPFast 2: MAPs credit 20 %42.53 + 20 × 57.47 / 100 = 54.02 %77.52 + 20 × 22.48 / 100 = 82.02 %
3b. BMPFast v1: no littoral zone (× 0.90)38.27 %69.77 %
4b. BMPFast v1: MAPs credit 20 %38.27 + 20 × 61.73 / 100 = 50.62 %69.77 + 20 × 30.23 / 100 = 75.82 %

BMPFast 2 returns 54.020 % and 82.018 % for these inputs, and BMPFast version 1 50.618 % and 75.816 %, the same as the hand calculation. With a littoral zone and the full credit, BMPFast 2 gives 52.53 % and 87.52 % before the MAPs credit, and 62.02 % and 90.02 % after it; BMPFast version 1 with a littoral zone gives 54.02 % and 82.02 %, the same as BMPFast 2 without one. The pool for 31 days of residence would be 31 × 12.0 / 365 = 1.02 ac-ft.

The curves

The plots show the removal against residence time with and without a littoral zone, with no MAPs credit, by BMPFast version 1’s method: the line with a littoral zone is the equations, and the line without is 90 % of them. In BMPFast 2 the pond without a littoral zone is the equations’ line, and the pond with one is that line raised by the credit (10 points at most). BMPFast calculated the values itself, through the steps above. The shaded part beyond 200 days counts only when “ART can be over 200 days” is ticked; otherwise a larger pool earns no more credit.

Total nitrogen removal (%) vs average annual residence time (days), with and without a littoral zone
Total nitrogen removal (%) vs average annual residence time (days), with and without a littoral zone
Total phosphorus removal (%) vs average annual residence time (days), with and without a littoral zone
Total phosphorus removal (%) vs average annual residence time (days), with and without a littoral zone

The pond equations remove at most about 43 % of the nitrogen (42.8 % at 200 days); in BMPFast 2 the full littoral zone credit raises this to about 53 %. The handbook’s 200-day maxima are the equations’ values, before the littoral zone credit. Where a higher nitrogen removal is needed, the pond is usually combined with other BMPs: retention before it, MAPs, or a filter after it.

Anoxic depth

The worksheet’s Anoxic Depth button estimates the depth below which the pond’s water is expected to lose its oxygen. A permanent pool deeper than that adds little treatment. It uses the pond’s phosphorus removal, or a measured pond TP if one is entered:

Pond TP (µg/l)         = 1000 × TP EMC (mg/l) × (1 − P removal / 100)   (or the value entered)
Chlorophyll-a (mg/m³) = e^(1.058 × ln(Pond TP) − 0.934)
Secchi depth (m) = (24.2386 + 0.3041 × Chl-a) / (6.0632 + Chl-a)
Anoxic depth (ft) = 3.281 × (3.035 × Secchi + 0.02164 × Chl-a − 0.004979 × Pond TP)

The equations hold for anoxic depths of about 0.8 to 29.5 ft (0.25 to 9 m). If the anoxic depth is less than the pond depth, recalculate the permanent pool volume with the anoxic depth.

Applicant’s Handbook reference

Section 2.0 Definitions and Terms, “Permanent pool”: the part of a wet detention pond “that normally holds water between the normal water level and the top of the anoxic zone or pond bottom, excluding any water volume claimed as wet detention treatment volume”; this is why the pool below the anoxic depth is left out. The anoxic depth equations themselves are from Harper and Baker (2007), Section 6.4.2 (pages 6-47 to 6-49), not the handbook.

Source reference

Harper, H.H. and Baker, D.M. (2007). Evaluation of Current Stormwater Design Criteria within the State of Florida. Final report, FDEP Contract S0108, Section 6.4.2 Zonation and Stratification (Figure 6-14 and Table 6-16, pages 6-47 to 6-49), applied in the design examples of Section 7 (link): gives the Florida relationships from pond TP to chlorophyll-a and from chlorophyll-a to Secchi depth, and the anoxic depth model, valid for anoxic depths of 0.25 to 9.0 m; BMPFast’s Anoxic Depth report uses these equations.

Wet detention with other BMPs

In the routing

When other catchments route their runoff into a catchment with a wet pond, the pond treats all of it. Its residence time is recalculated with the total runoff entering it: ART = Permanent Pool Volume / total inflow × 365. More runoff through the same pool means a shorter residence time and less removal. The same holds in a chain of ponds (Detention in Series): each pond is calculated with all the runoff reaching it, its own catchment’s and the ponds’ above it, and its removal applies to all the load reaching it; the strand report lists each pond’s residence time and removal, and they give the outlet load. See Routing.

Source reference

BMPFast method (StrandCalculations; Ron, 2026-10-15): each pond in a chain is calculated with all the runoff reaching it.

FDEP and the water management districts (2010). Stormwater Quality Applicant’s Handbook: Design Requirements for Stormwater Treatment Systems in Florida, March 2010 draft (not adopted), Section 25.3 Wet Detention In Series (pages 190 to 196) (the draft, not adopted: PDF, 16 MB): works a chain of five ponds in Zone 4 in which each pond receives its own basin’s runoff and the discharge of the pond above it; the draft says its method is for ponds with annual detention times under 100 days.

After retention (BMPs in Series)

When retention BMPs come before a wet pond, the retention removes part of the runoff, and only the rest reaches the pond. The pond’s Effective Residence Time = Permanent Pool Volume / volume passed on × 365, so the same pool holds the smaller volume longer. The retention also removes the particles that settle most easily, so the pond’s share is reduced:

e = removal of the retention system (%)
D = pond removal at the Effective Residence Time (%, step 2 above)
N contribution = (100 − e) × (D / 100 − 0.10 × e / 100) (not below 0)
P contribution = (100 − e) × (D / 100 − 0.20 × e / 100) (not below 0)
System removal = e + contribution

Source reference

BMPFast method (MultipleBMP.RouteRetentionToWetDetention, MultipleBMP.cs, about line 1316): the pond’s residence time uses only the volume the retention system passes on, and its share is reduced with adjustment factors of 10 (N) and 20 (P), marked in the code as “Temporary N/P Adjustment Factor”; the program gives no source for these factors.

Wet Detention twice in BMPs in Series is the catchment’s one pond used twice: it is calculated as one pond with the summed permanent pool (its 200-day limit, littoral zone and MAPs credit applied once). Two different ponds in series are modelled with the Routing, the second pond in a catchment with no area of its own; each pond is then calculated on its own and the removals chained (ERP Applicant’s Handbook Volume I, 9.5.1 Treatment Train Nutrient Reduction, Equation 9-5). The two give different results; Comparison of Methods for Calculating Wet Detention Ponds in Series works both on one example.

Applicant’s Handbook reference

Section 9.5.1 Treatment Train Nutrient Reduction (Equation 9-5): BMPs in series are combined as 1 − [(1 − Eff1) × (1 − Eff2) × …] when each acts independently; where an upstream unit changes how a downstream one works, “the designer should consider the use of another methodology”. BMPFast differs from Equation 9-5 for retention before a wet pond: the pond’s residence time is taken on the volume passed on, and its share is reduced by 0.10 e (N) and 0.20 e (P); two separate ponds in the routing are chained by Equation 9-5.

The full method, with its Equations report, is on BMPs in Series. A wet pond followed by stormwater harvesting is also handled there (Stormwater Harvesting).

Detention modes of other BMPs

Some BMPs have a detention setting. They hold water and release it through media or plants, not through a permanent pool, so they do not use the residence-time equations:

  • Rain Garden (Detention): no capture; the removal comes from the native soil and cover crop credit and the media.
  • Tree Well (Detention): the capture from the retention curves times the media’s reduction.
  • Vegetated Buffer and Vegetated Filter Strip (Detention + Plants): the buffer tables.

Source

The residence time equations are the best-fit relationships for Florida wet detention ponds in Harper, H.H. and Baker, D.M. (2007), Evaluation of Current Stormwater Design Criteria within the State of Florida, final report, FDEP Contract S0108: Figure 5-9 for total phosphorus (R² = 0.897) and Figure 5-10 for total nitrogen (R² = 0.800), pages 5-38 and 5-39 (Link). The anoxic depth equations are from the same report, pages 6-47 to 6-49. The BMPTrains model is described in the BMP Trains 2020 User Manual, Stormwater Management Academy, University of Central Florida (Link).

Sample problems

Worked problems solved in BMPFast, each with every input, the steps with screen captures, the program’s results, a hand check and the project file to download. Captures are for demonstration only. All of them: BMPFast sample problems.